RFI and submittal tracking for small general contractors
RFI and submittal tracking means keeping one log of every request for information and every submittal on a job, with who has it, when it was sent and the date a response is due under your contract. An automated workflow numbers each item, sends it to the architect, engineer or sub, reminds them before the due date, files the answer in the job folder and gives you a weekly list of what is late. Your project manager still writes the questions and decides what to build.
On this page
- RFIs and submittals: what each one is
- Before and after
- Where tracking breaks on a small job
- What an RFI and submittal log should hold
- Setting the response dates
- An RFI you can copy
- What the automated workflow does
- What stays with you
- How Mike Automations would build this
- Free tools for orders and deliveries
- What it looks like in practice
- What it costs
- Common questions
- Sources
RFI and submittal tracking is where small general contractors lose days without noticing. A question about a detail goes to the architect by email, the answer comes back three weeks later in a reply to a different thread, and the crew has already built it the old way. Shop drawings sit with a sub because nobody asked twice. A small GC usually runs this from inboxes and memory. This page sets out what a log needs, a log layout you can copy, an RFI template, and the parts that can run on their own while you keep the decisions.
RFIs and submittals: what each one is
- An RFI (request for information) is a written question to the design team when the drawings or specs are unclear, conflict or leave something out. The answer can change the work, so it may lead to a change order.
- A submittal is something you or your subs send for review before the work is built or the material is ordered: shop drawings, product data, samples, test reports and closeout documents.
- On federal jobs, the unified submittal list used with UFGS Section 01 33 00 (Submittal Procedures, published on WBDG) sorts submittals into 11 types, from SD-01 Preconstruction Submittals and SD-02 Shop Drawings to SD-11 Closeout Submittals. Private specs often have a similar Division 01 section.
- The federal clause FAR 52.236-21 says the contractor must coordinate shop drawings and review them for accuracy, completeness and compliance with the contract before submitting, and that the contracting officer's approval does not relieve the contractor of responsibility for errors or omissions in them. Private contracts often say much the same.
Before and after
The same job, before and after the workflow. For illustration.
| Today | With the workflow | |
|---|---|---|
| A new RFI or submittal | An email with no number | A numbered item from a short form, with a due date from your contract |
| Sending | From whoever's inbox | From your address to the right reviewer, logged |
| Chasing | When the crew is waiting | Reminders before and on the due date |
| The answer | Buried in a thread | Filed in the job folder with any marked-up drawings |
| Cost or time impact | Noticed later | A task for you to decide on a change order |
| Status | Ask the PM | One list per job every Monday: open, due, late |
Where tracking breaks on a small job
- RFIs go out as loose emails with no number, so nobody can say how many are open
- The response time in the contract or spec is never written into the log, so nobody knows when an answer is late
- A sub's shop drawings are due to you but nobody chases them until the material is needed
- A submittal returned for revisions is filed as done, and the resubmittal never happens
What an RFI and submittal log should hold
Keep one row per item, not one row per email. For illustration, a log on a small commercial fit-out might look like this on May 12:
| No. | Type | Subject | With | Sent | Due back | Status |
|---|---|---|---|---|---|---|
| RFI-007 | RFI | Ceiling height conflict at corridor B | Architect | May 1 | May 8 | Late, second reminder sent |
| RFI-008 | RFI | Door hardware set for room 104 | Architect | May 6 | May 13 | Open |
| SUB-03-01 | Shop drawings | Storefront framing | Glazing sub to GC | Requested Apr 28 | May 9 | Late from sub, call today |
| SUB-05-02 | Product data | Flooring, second submission | Architect | May 2 | May 16 | Under review |
| SUB-02-01 | Samples | Paint colors | Owner | Apr 20 | Apr 30 | Approved, filed |
Setting the response dates
The due date in your log should come from the contract, not from habit. Look in the general conditions and the Division 01 spec sections for how RFIs and submittals must be sent and how long the reviewer has. Some contracts give a number of days, some ask for a submittal schedule agreed at the start, and some only say the review must be reasonably prompt. Write whatever yours says into the log when the job starts, and every item gets its due date automatically. If it is silent, agree a turnaround with the architect in writing. This page isn't legal advice: if a late answer turns into a claim for time or money, take your log to your attorney.
An RFI you can copy
Subject: RFI-[number], [project name]: [short subject] Hi [name], RFI number: [number] Drawing or spec reference: [sheet, detail or section] Question: [one clear question] Our suggested answer: [what you propose, or "none"] Possible effect on cost or schedule: [none known / describe] Answer needed by: [date from the contract or agreed turnaround] Photos or marked-up drawings are attached. Please reply to this email so the answer is filed with the RFI. Thanks, [your name], [company], [phone]
What the automated workflow does
- Your project manager fills in a short form for each RFI or submittal, on a phone or laptop, with the job, the question or item, the reference and any photos. A question raised in a daily site report can start the same form.
- The workflow gives it the next number, works out the due date from the turnaround you set for that job and adds a row to the log.
- It emails the item to the right reviewer from your own address, using the template, with the attachments in one place.
- It reminds the reviewer a few days before the due date and again on the day, and tells you when an item is late. For submittals a sub owes you, it chases the sub on the dates you set, the same way a COI tracker chases certificates.
- When the reply arrives, it files the answer and any marked-up drawings in the job folder, updates the status and tells the site lead. A submittal returned for revisions goes back on the list as a resubmittal, not as done.
- If an answer may change cost or time, it creates a task for you to decide whether a change order is needed.
- Every Monday it sends you one list per job: open items, items due this week and late items, with how many days each is late.
What stays with you
Writing the questions, reviewing a sub's drawings before they go out, deciding what to build and whether to ask for a change order. The workflow keeps the log, sends and chases on time and files the answers. If AI drafts a reminder or summarizes an answer, a person checks it before it's sent or used.
How Mike Automations would build this
A free 15-minute call about how you handle RFIs and submittals today and where items get lost. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on the tools you already use (email, a spreadsheet, your job folders), so your team doesn't learn a new system. Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under a pay-when-happy agreement. To see the steps for your jobs first, build your plan here or try the demo.
Free tools for orders and deliveries
The free purchase order generator writes a purchase order with VAT and a delivery date, and the delivery note maker makes the matching delivery note.
ExampleFor illustration
What it looks like in practice
For illustration: on a small office fit-out, the site lead finds that the ceiling height on the drawings clashes with a duct. The project manager logs RFI-007 from a phone with two photos. It goes to the architect that afternoon, due in the seven days agreed at the start of the job, with a reminder two days before. The answer arrives a day late, is filed with the RFI and sent to the site lead, and because it moves a duct, the project manager gets a task to decide on a change order.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How do you track RFIs on a small construction project?
Keep one log with a number, date sent, question, who must answer, the date an answer is due, the answer and the date it came back. Remind the responder before the due date, and show the project manager every RFI that is overdue.
What should an RFI log include?
RFI number, date raised, the drawing or spec reference, the question, who it was sent to, the response due date, the answer, the date answered and any cost or schedule impact. One shared list that everyone can see beats emails.
What's the difference between an RFI and a submittal?
An RFI asks the design team a question about the drawings or specs. A submittal sends something for review before it's built or ordered, such as shop drawings, product data or samples.
How long does an architect have to answer an RFI?
Whatever your contract says. Some contracts set a number of days, some tie reviews to an agreed submittal schedule, and some only say reasonably prompt. Put your contract's terms into the log so every item has a due date.
Do I need dedicated construction project software?
Not for a few jobs at a time. A log in a spreadsheet with automatic numbering, reminders and filing covers most small GCs. If you run many large projects with big design teams, dedicated software may fit better.
Can subs send their submittals through the same workflow?
Yes. Each sub gets a request with an upload link and a due date, gets reminded until it arrives, and you review it before it goes to the architect.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
Read next
- Process Map Template for a Small Business (Free)A free process map template for a small business: steps, who, tool, wait time and exceptions, with a filled-in example. Map it before you automate it.
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
More guides
- Change order approvals for contractorsA change order approval workflow for contractors: write up the change on site, send it for e-signature, and start the extra work only once it's approved.
- Subcontractor COI trackingTrack subcontractor certificates of insurance without a spreadsheet: request COIs, log expiration dates and send renewal reminders before they lapse.
- Daily site reports for constructionConstruction daily site reports filled in on a phone, then filed, sent to the office and summarised for the client automatically. Form and steps.
- Home service contractors (US)Estimate follow-up automation for US home service contractors: follow up every estimate, remind customers before visits, log every lead. Live in 2-3 days.
- All workflow guides