GuideUS

SWPPP inspections: every site inspected on its schedule, with the report and the fixes on file

A SWPPP inspection workflow keeps one row per site with the schedule from its permit. It reminds the inspector before each routine inspection, asks for a rain check after a storm, collects the report from a phone form with photos, and follows each problem until someone marks it fixed. Each week you see what is late.

By Updated 5 min read

On this page
  1. Where stormwater inspections slip
  2. What the list holds for each site
  3. How the workflow runs
  4. What stays with you
  5. How Mike Automations would build this
  6. What it looks like in practice
  7. What it costs
  8. Common questions
  9. Sources

A construction stormwater permit sets how often a site must be inspected and what goes in the report. Under EPA's Construction General Permit, the standard choice is at least every 7 calendar days, or every 14 days plus an inspection within 24 hours of a storm of 0.25 inches or more. Most states issue their own permit with their own schedule. You have nine open sites under two superintendents. The inspections happen, mostly. The reports are on paper in the trucks, the silt fence that was down on Tuesday is still down, and the rain on Saturday is nobody's job.

Where stormwater inspections slip

  • The routine inspection is on one person's calendar, and that person is on vacation
  • It rains over the weekend and nobody checks whether the storm counts
  • The report is filled in on paper and reaches the binder two weeks later
  • A problem is written on the report and nobody is told to fix it
  • The fix is done, but no date or photo shows it
  • A site is stabilized, the notice to end coverage isn't filed, and the inspections quietly stop

What the list holds for each site

One row per site. The schedule comes from that site's own permit and its SWPPP, and a person on your team enters it. The workflow follows the row and never guesses the rule.

On the rowWhy it is there
Site, permit and permit numberState and EPA permits set different schedules
Routine schedule, as your permit states itThe reminders follow this
Rain rule: how much rain, and how soon to inspectTaken from the permit, not from memory
Inspector, and a back-upVacations happen every year
Last inspection and next one dueYou can see a late site at a glance
Open problems and who must fix themA report with no follow-up fixes nothing
Status: active, stabilized, coverage endedSo inspections stop only when a person says so

How the workflow runs

  1. Each open site is added once, with the schedule and the rain rule from its permit.
  2. The inspector gets a reminder the day before each routine inspection, with a link to the report form.
  3. The form follows your report template: date, weather, each control checked, problems found, photos and a signature.
  4. A submitted report is filed in the site's folder as a PDF, and the next date is set.
  5. If no report arrives by the end of the due day, the back-up and the superintendent are told the next morning.
  6. After rain, the inspector is asked to enter the reading from the site's rain gauge. If it reaches the amount on the row, a rain inspection is opened with its own deadline.
  7. Each problem on a report becomes a task for the named crew or subcontractor, with the photo and a due date you set.
  8. The task stays open until someone sends a photo of the fix. A person on your team checks it and closes it.
  9. When a site is stabilized, a person changes its status. The workflow never ends inspections by itself.
  10. Every week you get one list: late inspections, open problems and how old they are, and sites close to the end.
  11. If AI drafts a message to a subcontractor, a person checks it before it is sent.

What stays with you

Reading the permit, deciding who is qualified to inspect, judging whether a control is working and choosing the fix stay with you and your inspector. The rain reading comes from your own gauge or the source your permit allows. The workflow reminds, files and follows up. It doesn't inspect a site, and it gives no legal advice about your permit. Permits are reissued and changed from time to time, so check the current version for each site. For other site paperwork, see construction daily site reports and building permit and inspection tracking.

How Mike Automations would build this

A free 15-minute call about how many sites you have open and where the reports live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet, your email, text messages, an online form and shared folders). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your project software already tracks these inspections the way you want, you may not need this, and we'll say so on the call.

ExampleFor illustration

What it looks like in practice

For illustration: a site contractor has nine open sites under one state permit, on a weekly schedule with a rain rule. In one month the workflow sends 39 routine reminders. Thirty-six reports arrive on the day, and three arrive the next morning after the back-up is told. Two storms open eleven rain inspections, and all are done inside the permit's time. The reports list 27 problems. Twenty-two are closed with a photo within the due date, four are late and show on the weekly list, and one waits for a subcontractor.

What it costs

Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.

Book a free 15-minute callBuild your plan for thisEmail me

No pitch. In 15 minutes you'll know if it's worth building.

One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.

Common questions

How often does a construction site need a SWPPP inspection?

It depends on your permit. Under EPA's Construction General Permit the standard choice is every 7 days, or every 14 days plus within 24 hours of a storm of 0.25 inches or more. State permits differ, so follow your own.

Does the workflow decide when a rain inspection is needed?

It compares the reading your inspector enters with the amount on the site's row and opens the inspection. The amount and the source of the reading come from your permit.

Can we keep our own report form?

Yes. The phone form follows your template or the one your permit requires, and each report is saved as a PDF in the site's folder.

How much does it cost?

Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.

Sources

The facts on this page were checked against these official sources, last on .

  1. EPA: 2022 Construction General Permit, as modifiedepa.gov
  2. EPA: 2022 CGP final fact sheetepa.gov

Free PDF: 25 AI automations you can copy

Written for accounting firms; most of them work for any service business. Enter your email and the download link appears straight away. I may also email you when a new free tool goes up. To stop, reply to any email.

Site map