GuideUK

Scaffold inspection reminders: never let a scaffold pass seven days unchecked

Scaffold inspection reminders work when every scaffold on hire has its own row with the date of the last inspection. Under the Work at Height Regulations 2005, a scaffold is inspected before first use, at intervals of no more than 7 days and after anything likely to affect its stability. A simple workflow shows the inspector what's due each morning, sends the signed report to the site contact and flags any scaffold that is close to the limit.

By Updated 5 min read

On this page
  1. Why weekly inspections get missed
  2. What the workflow keeps for each scaffold
  3. A message you can copy
  4. How the workflow runs
  5. What stays with you
  6. How Mike Automations would build this
  7. Free tools for inspection reminders
  8. What it looks like in practice
  9. What it costs
  10. Common questions

A scaffolding firm with thirty jobs up has thirty clocks running, each started on a different day. The dates live on tags, in a diary and in the inspector's head. Then a week of rain moves the round, one house at the end of a lane is missed, and the site keeps working from a scaffold whose last report is nine days old. The inspection itself takes a competent person and a few minutes. Remembering which scaffold is due today is the part a workflow can carry.

Why weekly inspections get missed

  • Every scaffold went up on a different day, so every seven-day clock is different
  • The round is planned by area, not by due date
  • Nobody is sure whether the weekly check is yours or the site's under this contract
  • High winds or an alteration mean an extra inspection, and nobody tells the inspector
  • The report is written on paper and never reaches the site contact
  • The job runs past the hire period and falls off the list

What the workflow keeps for each scaffold

One row per scaffold, started from the handover certificate. Who carries out the weekly inspection depends on your contract with the customer, so the row records it. Check HSE's scaffold guidance for the current rules; the workflow follows the dates and never judges the scaffold.

FieldWhy it matters
Site address, customer and site contactThe report reaches someone on site
Handover date and certificateThe first inspection and the start of the clock
Who inspects weekly: you or the siteNo scaffold is left between two firms
Last inspection date and inspectorShows what's due and by when
Extra inspections after wind, impact or alterationsThe record shows why and when
Status: on hire, due, inspected, defect open, struckYou see what's open at a glance

A message you can copy

Email to the site contact after an inspection (edit the words in brackets)
Hi [first name], it's [name] from [company]. We inspected the scaffold at [site address] today, [date]. The inspection report is attached. Please keep it with your site records.

[No defects were found. / We found the following and have dealt with it: ...]

The next inspection is due by [date]. If the scaffold is hit, altered or there is bad weather before then, please stop using it and call us on [number] so we can inspect it before work carries on.

How the workflow runs

  1. When a scaffold is handed over, a row is created from the handover certificate with the site contact and who inspects weekly.
  2. Each morning the inspector gets one list: scaffolds due today and tomorrow, in route order, with any due today at the top.
  3. The inspector fills in the report on a phone form. The competent person signs it; the workflow only files it.
  4. The report goes to the site contact the same day and the row gets its new due date.
  5. If a site reports wind damage, an impact or an alteration, an extra inspection goes on the list and you decide who attends.
  6. Any scaffold that reaches day six with no report is flagged to the office. When a scaffold is struck, the row closes.

What stays with you

Every inspection, every decision that a scaffold is safe to use and every repair. The workflow doesn't inspect anything and can't mark a scaffold as passed without a signed report from your competent person. It keeps the dates, builds the round and gets the paperwork to the site. For other dated inspections, see LOLER examination reminders. For the daily paperwork on a build, see construction daily site reports. If AI drafts a message to a customer, a person reads and approves it before it's sent.

How Mike Automations would build this

A free 15-minute call about how handovers and inspections are recorded today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet, a phone form, email and text), so there's nothing new to learn. Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your scaffold software already builds the inspection round and sends the reports, you don't need this, and we'll say so on the call.

Free tools for inspection reminders

The free appointment reminder generator writes the inspection reminders and visit confirmations, and the invoice generator makes the invoice after each visit.

ExampleFor illustration

What it looks like in practice

For illustration: a scaffolding firm has 30 scaffolds on hire and one inspector. Each morning the inspector's phone shows the scaffolds due that day in route order. Each report is filled in on site and emailed to the site contact before the van leaves. On Friday the office sees one list of anything due over the weekend.

What it costs

Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.

Book a free 15-minute callBuild your plan for thisEmail me

No pitch. In 15 minutes you'll know if it's worth building.

One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.

Common questions

How often does a scaffold need inspecting?

Under the Work at Height Regulations 2005, before first use, then at intervals of no more than 7 days, and after anything likely to affect its stability, such as high winds or alterations. Check HSE's guidance for the detail.

Does the workflow do the inspection?

No. A competent person inspects and signs the report. The workflow shows what's due, files the report, sends it to the site and flags anything close to the limit.

What if the site does its own weekly checks?

The row records who inspects under the contract. For those scaffolds the workflow can remind the site contact and ask for a copy of their report instead.

How much does it cost?

Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.

Free PDF: 25 AI automations you can copy

Written for accounting firms; most of them work for any service business. Enter your email and the download link appears straight away. I may also email you when a new free tool goes up. To stop, reply to any email.

Site map