Fall arrest testing: every building's next date on one list, access arranged and the certificate sent
A fall arrest testing workflow keeps one row per building with each system, its last examination and the interval you set. Eight weeks before the next date it emails the site contact with visit dates and access questions, books the reply into the diary, sends the certificate you issue and follows up any remedial quote. Each week you see what is due, booked and overdue.
On this page
A roof safety line or a set of anchor points is tested, tagged and certified, and then nobody looks at the date until someone needs to go on the roof. The building manager has changed. The certificate is in an inbox that no longer exists. The roofer or window cleaner arrives, sees an out-of-date tag and can't clip on. You tested that system last year, and the repeat visit should be yours. The examination is your trade. Remembering every building's date and getting an answer about roof access is office work.
Why repeat tests are missed
- Dates are spread across the year and sit in last year's job folders
- The site contact left, and the reminder went to an address nobody reads
- Nobody asked about roof access, keys or permits until the engineers arrived
- One building has several systems with different dates
- A failed anchor was quoted for, and the quote was never chased
- The customer only calls when a contractor refuses to use the system
What the list holds for each building
One row per building and system. Your job software stays as it is, and the list can read from it. Many systems are examined by a competent person at least every 12 months, and some need it more often. The interval for each system comes from the standard you work to, the manufacturer's instructions and your own judgement, so that field is yours.
| On the row | Why it is there |
|---|---|
| Building, site contact and who pays | The person who books is often not the person who approves the cost |
| Each system: line, anchors, eyebolts or rail, and where it is | The engineers know what to bring and how long it takes |
| Last examination date and result | The date the next one is counted from |
| Interval you set, and the next date | The date every message works back from |
| Access: keys, permits, induction, who meets the engineers | A wasted visit costs more than the test |
| Visit: offered, booked, done | You see at a glance what is waiting for an answer |
| Certificate sent, and remedial quote: sent, accepted or waiting | A system that failed isn't finished until the work is done |
How the workflow runs
- Eight weeks before a system's next date, the site contact gets an email with two or three visit dates and your access questions.
- They pick a date and answer the questions in one reply. With no answer, a reminder goes a week later.
- After two reminders with no answer, your office gets a task to phone the site.
- The agreed date goes into the engineers' diary with the access notes.
- Two days before the visit, the site contact gets a reminder with the arrival time and what you need on the day.
- After the examination, your engineer writes the report and the certificate, and a person at your office approves them.
- The certificate goes to the site contact and the person who pays, and the next date is set on the row.
- If a system failed or needs work, the quote you wrote goes with the report, and is followed up until someone answers.
- An email that bounces is flagged, so you can find the new contact before the date and not after.
- A system that passes its date with no visit booked is flagged that day.
- Every week you get the list: tests due in the next eight weeks, visits booked, quotes waiting and systems overdue.
- If AI drafts a message or a summary of a report, a person checks it before it is sent.
What stays with you
The examination, the result, the certificate and any advice about whether a system can be used stay with your competent person. The workflow repeats your dates and your wording. It makes no statement about safety and doesn't decide an interval. If a system is out of date or has failed, the message says what your engineer wrote and nothing more. For another test that needs roof access, see lightning protection testing reminders. For lifting equipment on the same sites, see LOLER thorough examination reminders.
How Mike Automations would build this
A free 15-minute call about how many buildings you test and how repeat visits are booked today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (your job software or a spreadsheet, your own email and the engineers' calendar). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job software already reminds customers and books repeat visits, and you use it, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: a testing company looks after systems on 260 buildings. In September, 24 buildings are eight weeks from their date. Fifteen site contacts pick a visit date from the first email, and five more after the reminder. Two emails bounce, and the office finds the new building managers the same week. Two sites don't answer, and the office phones them. On the visits, three systems need work. Each customer gets the report and the quote the same week, and two accept after the first follow-up. At the end of the month the weekly list shows one building overdue, and the office knows which one.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often does a fall arrest system need testing?
Many systems are examined by a competent person at least every 12 months, and some need it more often. The interval for each system is set by you, from the standard you work to and the manufacturer's instructions. The workflow uses the interval on the row.
Does the workflow issue certificates?
No. Your engineer writes the report and the certificate, and your office approves them. The workflow sends them and records the date.
Do we need new software?
No. The list can be a spreadsheet or can read from the job software you use today. Emails go from your own address.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- Why Your Text Message Costs 2 or 3 SMS (and the Fix)Why an SMS reminder is billed as 2 or 3 messages: the 160-character limit, Unicode, curly quotes and emoji. How to keep reminders to one SMS.
More guides
- Lightning protection test remindersFor lightning protection firms: every building on one list with its next test date, the visit offered weeks ahead and remedial quotes followed up.
- LOLER examination remindersLOLER thorough examination reminders for inspection firms: one register per site, customers asked before each due date, reports sent and defects followed up.
- Fire damper testing remindersFor fire damper testing firms: every building on one list with its next test date, visits offered weeks ahead and failed or unreached dampers followed up.
- Fire alarm service remindersFire alarm service reminders for UK fire alarm companies: every site's next visit on one list, visits booked with the site and certificates sent.
- All workflow guides