GuideUK
Dry riser testing reminders: the six-monthly check and the annual test, booked before they're due
A dry riser testing reminder workflow keeps one row per riser with the dates of its last visual check and last pressure test. Weeks before either is due, it tells the building's contact, offers visit dates and records the result afterwards. A competent engineer does the test and writes the certificate.
On this page
Fire protection firms describe the same routine under BS 9990: a visual inspection of each dry riser every six months and a full pressure test once a year. So every building has two dates a year, and a tall block can have several risers. For the firm, the dates sit in last year's job sheets. For the managing agent, they sit in a certificate in a shared folder. The six-monthly check is the one that slips, because it is a short visit that nobody put in the diary.
Where riser dates slip
- The annual test is in the diary but the six-monthly visual check isn't
- A building changes managing agent and the new one doesn't know when the last test was
- The engineer needs the inlet cabinet key and roof access, and the visit is wasted when nobody is there
- A check finds a missing cap or a damaged valve, the repair is quoted, and the retest is never booked
- One block has three risers tested on different dates after past repairs
- The firm did last year's test and has no list of what is due next month
What the list holds for each riser
One row per riser, not per building. The firm's engineer decides what each visit covers and whether the riser passes.
| On the row | Why it's there |
|---|---|
| Building, riser location and inlet location | The engineer finds it without a phone call |
| Date of the last visual check | Sets the next six-monthly date |
| Date of the last pressure test and certificate | Sets the next annual date |
| Site contact, key holder and access notes | The visit isn't wasted |
| Open defects and quotes | A repair and its retest don't get lost |
| Who gets the certificate | Managing agent, landlord or the responsible person |
How the workflow runs for a fire protection firm
- Every riser you look after goes on one list with its two dates. Past jobs are loaded from your job sheets or your software's export.
- Six weeks before a check or a test is due, the building's contact gets an email with the address, what is due and two or three visit dates.
- The contact picks a date and confirms access: who holds the keys and who meets the engineer. The visit goes in the engineers' diary.
- Risers in the same building, or buildings on the same street, are offered on the same day.
- No reply after a week brings one reminder. After that, the building goes on a short call list for your office.
- The day before, the contact gets a reminder with the time and the access you need.
- After the visit, your engineer records the result. A pass sets the next date. A defect opens a line for the quote and the retest, so it stays visible until it's closed.
- The certificate or report is emailed to the person named on the row and filed against the building.
- If AI drafts a message, a person checks it before it is sent.
If you manage the building
The same list works from the managing agent's side. Each riser has a row next to the building's other fire safety dates, and the property manager gets a reminder six weeks before, with the contractor's details. When the contractor's report arrives, it is filed and any defect becomes a task with an owner. For the other dates in a block, see fire door inspection reminders and emergency lighting test reminders.
What stays with you
The inspection, the pressure test, the certificate and every decision about whether a riser is fit for use. The responsible person for the building stays responsible for it. The workflow reminds, books and files. It isn't fire safety advice, and it doesn't replace the standard or your fire risk assessment, so check the current edition of BS 9990 and your assessor's advice for your own buildings. Firms that also service alarms can see fire alarm service reminders.
How Mike Automations would build this
A free 15-minute call about how many risers are on your books and where the dates live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet, email and your engineers' diary). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job management software already sends these reminders, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: a fire protection firm looks after 210 risers in 140 buildings. On the first of September the list shows 18 visits due in the second half of October: 11 visual checks and 7 annual tests. Each contact gets a message with dates. Twelve are booked in the first week and four after the reminder. The office rings the last two: one books, and one building has a new managing agent, so the row gets the new contact and the message is sent again. One test finds a seized landing valve. The row shows the quote, and three weeks later the retest date.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often should a dry riser be tested?
Fire protection firms describe the routine under BS 9990 as a visual inspection every six months and a full pressure test every year. Check the current edition of the standard and your fire risk assessment for your own building.
Who can test a dry riser?
A competent person, usually an engineer from a fire protection firm with the right equipment. The workflow doesn't test anything. It keeps the dates, books the visit and files the report.
What happens when a test finds a defect?
The row stays open with the defect, the quote and the retest date. It shows on the weekly list until your engineer records the retest, so a failed riser can't quietly drop off.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
- PTSG: Dry and wet risersptsg.co.uk
- Fareham Borough Council: Dry riser inspectionsfareham.gov.uk
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- How to Reply to New Enquiries Fast: Auto-Reply TemplatesHow to reply to new enquiries fast when you're busy: one list for every enquiry, an honest auto-reply in minutes and a next-day check. Templates included.
More guides
- Fire alarm service remindersFire alarm service reminders for UK fire alarm companies: every site's next visit on one list, visits booked with the site and certificates sent.
- Emergency lighting test remindersEmergency lighting test reminders for electrical and fire safety firms: every site's annual test booked on time, and monthly test logs asked for.
- Lightning protection test remindersFor lightning protection firms: every building on one list with its next test date, the visit offered weeks ahead and remedial quotes followed up.
- Fire damper testing remindersFor fire damper testing firms: every building on one list with its next test date, visits offered weeks ahead and failed or unreached dampers followed up.
- All workflow guides