GuideUK
PSSR examination reminders: every pressure system examined before its date
A PSSR reminder workflow keeps one row per pressure system with the interval from its written scheme of examination and the date of the last examination. It contacts the customer a few weeks before the next one is due, books the visit, checks the system can be made ready, and files the report. A competent person does the examination and writes the report.
On this page
HSE's guidance on the Pressure Systems Safety Regulations 2000 says a written scheme of examination must be in place before a pressure system is used, and that a competent person must examine the system within the intervals the scheme sets. There is no single interval for every system: the scheme for a small air receiver in a garage and the scheme for a steam boiler in a laundry give different dates, and one scheme can give different intervals for different parts. A compressor service company with a few hundred customers has hundreds of dates, each read from a different document.
Where PSSR examinations slip
- The due date is on the last report, and the report is in a file in the customer's workshop
- The customer thinks the annual service and the examination are the same visit
- A receiver was replaced or a second compressor added, and the written scheme was never updated
- The examiner arrives and the system is running, so nothing can be opened up
- One site has an air receiver, an autoclave and a steam boiler, each with its own interval
- The report lists repairs to do before a date, and nobody follows them up
What the list keeps
One row per system, or per part where the scheme gives parts their own intervals. If you already use job software or a spreadsheet, the workflow reads from it and adds the reminders and the follow-up.
| Field | Why it matters |
|---|---|
| Customer, site and who is responsible for the system | So the reminder goes to the person who can shut it down |
| System and the parts the scheme covers | So a new receiver or valve shows as not on the scheme |
| Written scheme reference and who certified it | So the interval comes from the document, not from memory |
| Interval from the scheme | Set per system or per part by the competent person |
| Last examination date and report reference | So the next date is counted from a record |
| Next examination due | So the visit is offered weeks before the date |
| Repairs or changes the report asked for, with dates | So each one gets an answer |
How the workflow runs
- Each system goes on the list with its scheme reference, interval and last examination date. Systems with no scheme or no report on file are marked and go to the top.
- A few weeks before an examination is due, the customer gets an email with the system, the due date and two dates an engineer is in the area.
- A reply books the visit and puts it in the diary. No reply gets a second message, then a place on a short call list.
- When the visit is booked, the customer gets one message about what the examiner needs: when the system can be shut down and isolated, and who gives access.
- The day before, the site contact gets a reminder with the time.
- After the visit, the report is sent to the customer, filed against the system, and the next date is set from the scheme.
- Each repair or change the report asks for becomes a line with its date. The customer is asked about it before that date, and you can offer a quote.
- When a job sheet shows a part was replaced or added, the row is flagged "scheme may need review" for the competent person.
- If AI reads a report or drafts a message, a person checks it before it is sent.
What stays with you
The written scheme, the examination, the report, and the decision on whether a system needs a scheme at all. The workflow reminds, books and files. It is not legal advice: the duties sit with the user or owner of the system, and HSE's guidance and Approved Code of Practice are the place to check what applies. Companies that also examine lifting equipment can use LOLER examination reminders, and for extraction systems see LEV testing reminders.
How Mike Automations would build this
A free 15-minute call about how many systems you look after and where the dates live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet or job software, email, a calendar and a shared folder). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job software already tracks examination dates per system and chases the follow-up, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: a compressor service company looks after a joinery workshop with one air receiver. The list shows its examination is due in six weeks and emails the owner two dates. He picks the Thursday and replies that the workshop closes at four, so the system can be isolated then. The engineer examines it, the report goes to the owner and is filed, and the next date is set from the scheme. The report asks for a safety valve to be replaced within three months. That becomes an open line, and the owner gets a quote two weeks later.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often does a pressure system need a PSSR examination?
There is no single interval. HSE's guidance says a competent person examines the system within the intervals set in its written scheme of examination. The workflow uses the interval from each system's own scheme.
Is an examination the same as a service?
No. A service keeps the equipment running. The examination under the written scheme is done by a competent person and ends in a report. The workflow keeps the two dates apart, so one isn't mistaken for the other.
Does the workflow decide whether a system needs a written scheme?
No. The user or owner and the competent person decide that. The workflow keeps the dates, reminds people and files the report.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- Client Onboarding Automation for a Service BusinessClient onboarding automation for a small service business: the 8 steps, a checklist to copy, a welcome email, and what should stay human.
More guides
- LOLER examination remindersLOLER thorough examination reminders for inspection firms: one register per site, customers asked before each due date, reports sent and defects followed up.
- LEV testing remindersFor LEV testing companies and workshops: every extraction system booked before its thorough examination is due, reports sent and actions followed up.
- Termite renewal and annual inspection remindersFor pest control companies: every termite plan's renewal date on one list, the annual inspection booked ahead and reminders until the customer renews.
- Fall arrest system testing remindersFor UK fall protection companies: every building's next test date on one list, visits and roof access arranged ahead, and remedial quotes followed up.
- All workflow guides