Solar installer paperwork, from first enquiry to handover pack
Automating solar installer paperwork means one record per job that moves from enquiry to survey, quote, signed contract, customer documents, installation and handover, with each message and reminder sent at the right step. For MCS installations in the UK, MCS says the installation must be registered no later than 10 working days after commissioning and the MCS certificate goes in the customer's handover pack, so a workflow that starts that clock on commissioning day keeps the deadline in view. The same approach works for heat pump installers and for US installers working to their utility's steps.
On this page
- The job, step by step, and what each step needs
- Before and after
- UK dates that come from MCS and gov.uk
- For US installers
- A handover checklist you can copy
- A document request you can copy
- Where installer paperwork stalls
- What stays with you
- How Mike Automations would build this
- Free tools for installers
- What it looks like in practice
- What it costs
- Common questions
- Sources
Solar installer paperwork grows with every job you win. A solar PV or heat pump job starts as an enquiry, needs a survey, a quote that gets chased, a contract, documents from the customer, often a grant or network application, and ends with a handover pack, a certificate and warranty registrations. Most of that lives in inboxes and on a whiteboard. This page sets out the steps where the dates matter, what MCS says about them, and a handover checklist you can copy.
The job, step by step, and what each step needs
| Step | What you need | What can run on its own |
|---|---|---|
| Enquiry | Address, roof or property type, energy bills, photos | A reply within minutes with a short form for the details and photos |
| Survey | A booked visit and the customer's access details | Booking link, confirmation and a reminder the day before |
| Quote | Your design and price | Follow-ups on day 3, day 7 and day 14 until a yes or no |
| Contract | Signed contract and deposit, if you take one | E-signature request and a payment link |
| Customer documents | Bills, meter details, proof of ownership, grant forms | One checklist per job, reminders listing only what's missing |
| Installation | Booked dates, scaffold, materials | Date confirmations to the customer and your team |
| Handover | Certificate, manuals, warranties, test results | Pack assembled from the job folder and sent, warranty reminders logged |
Before and after
The same job, before and after the workflow. For illustration.
| Today | With the workflow | |
|---|---|---|
| Customer documents | Asked for by phone | A request with an upload link after the quote is signed; reminders name only what is missing |
| Commissioning | The date is in someone's notebook | Recorded on the job; the registration countdown starts |
| Registration and certificates | Done in a rush at the deadline | On the job's checklist, with the certificate saved to the folder |
| The handover pack | Papers in a folder, some missing | One link or PDF with every document and a note on what each one is for |
| After handover | Nothing | Reminders for the first service and warranty dates, and a review request |
UK dates that come from MCS and gov.uk
Check these against the current MCS standard for your technology, since they can change.
- DNO notification: MCS's guidance for homeowners says the Distribution Network Operator needs notifying before the installer begins work, and that in some cases the installer can do this on the homeowner's behalf. Your workflow can hold the job's start date until you've marked the notification done.
- MCS certificate: MCS says registration on the MCS Installation Database must be completed no later than 10 working days after commissioning, and only by the MCS certified contractor who signed the contract with the customer. The certificate is included in the handover pack.
- Heat pump handover pack: MCS tells homeowners to expect a list of the system's key parts, health and safety guidance, a recommended servicing and maintenance schedule, the manufacturer's manuals, all relevant guarantees and warranties, and a copy of the MCS Customer Commitment.
- Boiler Upgrade Scheme: gov.uk says the scheme is open to people in England and Wales, the installer applies on the homeowner's behalf on the Ofgem website, and Ofgem contacts the homeowner to confirm the installer is acting for them. The grant is £7,500 towards an air source or ground source heat pump.
For US installers
The paperwork is different but the shape is the same: a building permit, your utility's interconnection application and approval to switch the system on, plus any incentive paperwork. Each utility and local building department sets its own forms and order, so the workflow follows the steps you give it rather than a national rule. It still gives you a document checklist per job, reminders for anything missing and a date on every step.
A handover checklist you can copy
- Commissioning day: record the date and start the 10-working-day MCS registration countdown (UK MCS jobs).
- Register the installation and save the MCS certificate to the job folder.
- Add the commissioning and test results, the list of key parts with serial numbers, and the manufacturers' manuals.
- Add the servicing and maintenance schedule and your workmanship warranty.
- Register product warranties with each manufacturer, using their own process and deadline, and save each confirmation.
- Send the pack to the customer as one link or one PDF, with a short note on what each document is for.
- Set reminders for the first service visit and any warranty check dates, and ask for a review. Garages do the same with MOT and service reminders.
A document request you can copy
Subject: [address]: what we need from you before installation Hi [first name], Thanks for going ahead with your [solar PV / heat pump] installation. Before we can book your installation date, we need: 1. [A recent electricity bill showing your MPAN] 2. [Photos of your consumer unit and meter] 3. [Proof of ownership, if needed for your grant] You can upload them here: [upload link]. We'll remind you only about anything still missing. Any questions, reply to this email or call [phone]. [your name], [company]
Where installer paperwork stalls
- Quotes go out and nobody follows up, so they go cold: the quote follow-up workflow fixes that
- The customer sends half the documents and the rest are forgotten
- Commissioning happens on a Friday and the certificate isn't registered until someone notices
- Warranty registrations sit undone because the serial numbers are on a photo in someone's phone
- The handover pack is built by hand for every job from five different folders
What stays with you
System design, pricing, every technical and safety decision, and every submission to MCS, a network operator, Ofgem or a utility. The workflow keeps the checklist, sends reminders, builds the pack from your files and shows what's due. If AI drafts a message to a customer, a person always approves it before it's sent.
How Mike Automations would build this
A free 15-minute call about how a job moves through your business today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on the tools you already use (your email, a spreadsheet or job software, cloud folders, an e-signature tool), so there's nothing new to learn. Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it. You can see the steps for your business first, and the completion photos workflow pairs well with handover.
Free tools for installers
The free quote generator builds the installation quote PDF, and the quote follow-up message generator writes the nudge while the customer decides.
ExampleFor illustration
What it looks like in practice
For illustration: a customer signs a solar PV and battery quote on a Monday. That afternoon they get a document request with three items and an upload link. They send two; four days later a reminder asks only for the meter photos. The installation is commissioned on a Thursday, the job record shows the MCS registration due date, and the office registers it the next week. The handover pack goes out as one link with the certificate, manuals, test results and warranties, and the first service reminder is already set.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How long do we have to register an MCS installation?
MCS says registration on the MCS Installation Database must be completed no later than 10 working days after commissioning. Check the current standard for your technology in case it changes.
Does the workflow submit anything to MCS, the DNO or Ofgem for us?
No. It tracks the dates, holds the documents and reminds you. The submissions stay with you.
Does it work for heat pump installers?
Yes. The steps are the same shape: survey, quote, documents, installation, handover pack and service reminders.
We're a US installer. Does it fit our permit and utility steps?
Yes. You give it the steps your utility and building department require, and it tracks each job against them.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
- MCS: Solar panels (PV) for consumersmcscertified.com
- MCS: Air source heat pumps for consumersmcscertified.com
- GOV.UK: Apply for the Boiler Upgrade Schemegov.uk
Read next
- Estimate Follow-Up Email Templates for Contractors (+ Texts)Estimate follow-up email templates for contractors: a day-by-day sequence, 5 emails, 2 texts and a reply to "your price is too high". Copy and paste.
- How to Ask for a Deposit on a Quote (With Templates)How to ask for a deposit on a quote: when it makes sense, wording for the quote and invoice, UK and US cancellation rules, and a deposit that books the job
- How to Reply to New Enquiries Fast: Auto-Reply TemplatesHow to reply to new enquiries fast when you're busy: one list for every enquiry, an honest auto-reply in minutes and a next-day check. Templates included.
More guides
- Home service contractors (US)Estimate follow-up automation for US home service contractors: follow up every estimate, remind customers before visits, log every lead. Live in 2-3 days.
- WhatsApp quote follow-up for tradespeopleWhatsApp quote follow-up for tradespeople: a 3-message sequence with timing, how Meta's templates and opt-in rules work, and what to automate.
- Job sign-off and completion photosA job completion sign-off form for contractors: completion photos, a snag list, the customer's signature, then the final invoice and a review request.
- Change order approvals for contractorsA change order approval workflow for contractors: write up the change on site, send it for e-signature, and start the extra work only once it's approved.
- All workflow guides