Workflow guideUK
Gas safety, EICR and EPC reminders for letting agents
Gas safety, EICR and EPC reminders for letting agents work best as one list of every property and certificate, with renewals started weeks before each expiry date. In England a gas safety check is due every 12 months, an electrical inspection (EICR) at least every 5 years, and an EPC lasts 10 years. A workflow can book the renewal, collect the new certificate and flag anything late, while a person checks each document.
On this page
- The renewal dates in England
- Before and after
- Where certificate tracking breaks down
- What an automated reminder workflow does
- A reminder schedule that works
- What to check on a new certificate
- Who is responsible, agent or landlord
- A reminder you can copy
- What stays with you
- How Mike Automations would build it
- Free tools for certificate dates
- What it looks like in practice
- What it costs
- Common questions
- Sources
Gas safety, EICR and EPC reminders are the dates a letting agent cannot afford to miss, and every managed property has its own set. Most agencies track them in a spreadsheet that one person keeps up to date. Chasing renewals is the same steps every time, so it can run as a workflow while your team keeps the checks. Right to rent follow-up checks work the same way. This page covers the rules for private lettings in England; Scotland, Wales and Northern Ireland have their own rules, so check those for properties there.
The renewal dates in England
These are the main certificates for a private let in England, from the official guidance as it stood in November 2026. HSE says gas safety checks must be done every year by a Gas Safe registered engineer, and the record kept for 2 years. Since 2018 the check can be done up to 2 months before the due date while keeping the original deadline, so booking early does not shorten the cycle. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (regulation 3, on legislation.gov.uk) require an inspection at least every 5 years, or sooner if the last report says so. Gov.uk says an EPC is valid for 10 years and must be ordered before you market a property to let.
| Certificate | How often | Copy to tenants | When to start the renewal (suggested) |
|---|---|---|---|
| Gas safety record | Every 12 months (HSE) | Existing tenants within 28 days of the check; new tenants before they move in | 8 weeks before expiry: a check in the last 2 months keeps the original date |
| EICR (electrical report) | At least every 5 years, or sooner if the report says so | Existing tenants within 28 days; new tenants before they move in; a prospective tenant within 28 days of a written request | 3 months before expiry, to allow time for any remedial work |
| EICR remedial work | Within 28 days of the inspection, or sooner if the report says so | Written confirmation to tenants and the council within 28 days of the work being done | Same day the report arrives |
| EPC | Valid for 10 years | Shown to anyone renting the property | Before marketing a re-let if the EPC has expired |
Before and after
The same job, before and after the workflow. For illustration.
| Today | With the workflow | |
|---|---|---|
| Tracking expiry dates | A spreadsheet, updated when someone remembers | One list of every property and certificate, with each renewal date |
| Starting renewals | When the certificate has already expired | Weeks before expiry, automatically |
| Booking the engineer | Phone calls between other work | The request goes to your contractor with the property details; the tenant is told the date |
| Filing the new certificate | Email attachments | Saved to the property's folder; the next renewal date is set from it |
| Landlord reporting | On request | Each landlord sees what is current and what is due |
Where certificate tracking breaks down
- Expiry dates live in a spreadsheet, a calendar and people's heads, and they don't always agree
- Renewals get booked late because nobody saw the date coming
- The engineer does the check, but the new certificate never makes it into the property file
- The tenant never gets their copy within the 28 days, because nobody was asked to send it
- An EICR comes back unsatisfactory and the 28-day clock for remedial work starts without anyone noticing
What an automated reminder workflow does
- Keeps one list of every property, each certificate it needs and its expiry date, in the spreadsheet or software you already use.
- Sends you a weekly list of anything missing, expired or due in the next 90 days.
- Contacts your usual engineer or the landlord at the lead time you set, with the address and access details, and asks for a date. Heating engineers keep the same kind of list from their side: see boiler service and gas safety reminders.
- After the visit, asks for the new certificate, files it against the property and puts it in front of a person to check.
- Once a person has checked it, updates the expiry date and sends the tenant their copy, logging the date it went out.
- If an EICR lists remedial work, starts a 28-day tracker for that property and chases the contractor for written confirmation.
- Tells a named person when a date is close and nothing has been booked.
A reminder schedule that works
These lead times are a suggestion, not a legal rule. Set them to match how quickly your engineers can book.
| Days before expiry | Gas safety | EICR | EPC |
|---|---|---|---|
| 90 | Appears on the weekly list | Contact engineer or landlord to book | Check if it expires this year |
| 60 | Ask for a visit date (a check from here keeps the original date) | Chase if no date booked | Order a new one if re-letting soon |
| 30 | Chase the booking, tell the tenant | Agree access with the tenant | Order a new one if not done |
| 14 | Name a person to phone | Name a person to phone | Hold the re-let until sorted |
| Expired | Escalate the same day | Escalate the same day | Escalate before marketing |
What to check on a new certificate
- The address matches the property in your list, including the flat number
- The date of the check or inspection, and the next due date, are shown
- The engineer's name and Gas Safe number (for gas) or qualification details (for an EICR) are there
- The result is satisfactory, and any remedial work or unsafe appliance is flagged to a person at once
- Every appliance or circuit the landlord needs covered is listed
- The tenant copy is sent within the deadline, and the date is logged
Who is responsible, agent or landlord
The duty sits with whoever manages the property, and your management agreement should say which certificates you handle and which the landlord does. Put the answer for each property in your list, so the workflow chases the right person. If you are unsure which of you holds a duty for a given property, ask your trade body or a solicitor.
A reminder you can copy
Subject: Gas safety record due for [property address] on [expiry date] Hi [landlord name], The gas safety record for [property address] expires on [expiry date]. A check can be done up to 2 months early without changing the renewal date, so now is a good time to book it. Once your Gas Safe engineer has visited, please upload the new record here: [upload link]. We'll check it, send the tenant their copy and update our records. If you'd like us to arrange the check with our usual engineer instead, just reply to this email. Thanks, [your name] [agency name]
What stays with you
The legal duties stay with the landlord and with you as their agent, and the workflow doesn't change that. The same goes for the 30-day deposit protection deadline and rent review dates. You choose which certificates each property needs and how early to start. A person checks each new certificate before the date in the list is updated, and decides what happens when a check fails, a report is unsatisfactory or a date is missed. If AI reads a date from a certificate or drafts a message to a landlord, a person always approves it first. The same rule applies when a tenant falls behind: our guide to chasing rent arrears keeps every legal step with a person.
How Mike Automations would build it
A free 15-minute call about how you track certificates today and where things slip. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on the tools your agency already uses (your email, a shared spreadsheet or drive, and your property management software where it allows a connection), so nobody learns a new system. Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it.
Free tools for certificate dates
The free working days calculator counts the working days before each certificate expires, and the appointment reminder generator writes the access reminder for tenants before the visit.
ExampleFor illustration
What it looks like in practice
For illustration: a flat's gas safety record is due in seven weeks. The workflow emails your usual Gas Safe engineer with the address and the tenant's access details and asks for a date, then lets the tenant know. After the visit, the engineer is asked to upload the new record. A member of your team checks it, confirms the new date, and the tenant's copy goes out the same day. If no visit has been booked three weeks before the date, the property appears at the top of your weekly list.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
We already have property management software. Does this replace it?
No. Many systems store the dates. This adds the chasing around them: booking the renewal, collecting the certificate, sending the tenant's copy and telling you what's still open.
Does it know the rules for every certificate?
You set which certificates each property needs and how early to start the renewal. On the call we go through your list, including any properties in Scotland or Wales, where the rules differ. The workflow follows your settings, it doesn't give legal advice.
What about landlords who arrange their own checks?
They get the reminder instead of your engineer, plus a link to upload the new certificate. If nothing arrives, the reminders continue and you're told.
How do letting agents keep track of gas safety, EICR and EPC expiry dates?
Keep one list with a row per property and certificate, and sort it by expiry date. Start renewals 60 to 90 days out and review the list weekly. A workflow can send the reminders, book the engineer and file each new certificate.
How far ahead should a letting agent start a gas safety renewal?
HSE says the check can be done up to 2 months before the due date and keep the original deadline, so starting about 8 weeks out is sensible. Starting earlier leaves room if an engineer is busy.
Do I have to give tenants a copy of every certificate?
For gas safety and EICR, the guidance above sets deadlines for giving tenants a copy, so log the date each one goes out. Check the current GOV.UK and HSE pages for your case.
Can a spreadsheet do this?
A spreadsheet stores the dates but doesn't chase anyone. The workflow adds the reminders and filing on top of the spreadsheet you already use. Live in 2-3 days. You pay once it's running and you're happy with it.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
- HSE: Gas safety, landlords and letting agents FAQshse.gov.uk
- legislation.gov.uk: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, regulation 3legislation.gov.uk
- GOV.UK: Electrical safety standards in the private and social rented sectors, guidancegov.uk
- GOV.UK: Energy Performance Certificatesgov.uk
Read next
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- How to Brief an Automation Project (Free Template)An automation project brief template for small businesses: the process today, the tools, what done looks like and what stays manual. Copy and fill in.
- BAS Client Records Reminder Schedule for 2026-27A BAS client records reminder schedule for 2026-27: when to ask for each quarter's records to meet the ATO agent due dates, plus a client email template.
More guides
- Maintenance requests for letting agentsA maintenance request workflow for UK letting agents: capture repairs with photos, get landlord approval, book the contractor and keep tenants updated.
- Right to rent follow-up remindersWhen a right to rent follow-up check is due in England, how to work out the date, plus a reminder timeline and a tenant message so you never miss it.
- Landlord repair approval limitsSet a landlord approval limit for repairs, send a ready approval request, chase slow replies on a schedule and log every decision. For UK letting agents.
- Tenancy renewal and rent review remindersTenancy renewal reminders for letting agents after England's 1 May 2026 changes: rent review dates, Form 4A timing, US lease renewals and templates.
- All workflow guides