GuideUK
TM44 inspection reminders: every building booked before its five-year date
A TM44 reminder workflow keeps one row per building with the date of its last air conditioning inspection. It contacts the building's manager a few months before the next one is due, collects the information the assessor needs before the visit, sends the report afterwards and sets the next date. An accredited energy assessor does the inspection and writes the report.
On this page
GOV.UK's guide to air conditioning inspections says that systems with an effective rated output of more than 12kW must be inspected by an energy assessor, and that the inspections must be no more than five years apart. The guide covers England and Wales. Scotland and Northern Ireland have their own rules. Five years is long enough for everything around the date to change: the person who booked the last inspection has moved on, the building has a new managing agent, and the report is in an inbox nobody can open. An assessor or contractor with a few hundred buildings can't hold those dates in their head.
Where TM44 inspections slip
- The due date is on a report from five years ago, and the contact on it has left
- The building changed owner or managing agent and nobody passed the report on
- New units were added, so a building that was under 12kW is now over it and isn't on any list
- The assessor arrives and there is no asset list, no maintenance records and no roof access
- The report recommends changes, and nobody looks at them again
- A customer with twenty sites has twenty different dates
What the list keeps
One row per building. If you already keep a spreadsheet or use job software, the workflow reads from it and adds the reminders and the follow-up.
| Field | Why it matters |
|---|---|
| Building and who is responsible for the system | So the reminder goes to the person who can book it |
| Total rated output and number of units | So a building that grows past 12kW gets a date |
| Last inspection date and report reference | So the next date is counted, not remembered |
| Next inspection due | So the visit is offered months before the date, not after |
| Site contact and a second contact | So the message still lands after five years of staff changes |
| Pre-visit information received | Asset list, maintenance records, access |
| Report sent and recommendations | So each recommendation gets a reply |
How the workflow runs
- Each building goes on the list with the date of its last inspection. Buildings with no report on file are marked "no date" and go to the top.
- A few months before the next inspection is due, the responsible person gets an email with the building, the due date and two dates an assessor is in the area.
- A reply books the visit and puts it in the diary. No reply gets a second message, then a message to the second contact, then a place on a short call list.
- Once the visit is booked, the site gets one form asking for what the assessor needs: the asset list, maintenance records, and who gives access to plant rooms and the roof.
- The day before, the site contact gets a reminder with the time and what is still missing.
- After the visit, the report is sent to the customer and filed against the building, and the next date is set.
- Each recommendation in the report becomes a line. The customer is asked about it once, a few weeks later, and you can offer a quote.
- Once a year, each customer is asked whether units were added or removed, so the list stays right.
- If AI reads a report or drafts a message, a person checks it before it is sent.
What stays with you
The inspection, the report, the advice, and the decision on whether a building's systems are over 12kW. The workflow reminds, collects and files. It is not legal advice: the duty to have the system inspected sits with the person who controls it, and GOV.UK's guide is the place to check what applies to a building. Companies that also service the equipment can use F-gas leak check reminders, and for extraction systems see LEV testing reminders.
How Mike Automations would build this
A free 15-minute call about how many buildings you look after and where the dates live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet or job software, email, a calendar and a shared folder). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job software already tracks five-year dates per building and chases the pre-visit information, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: an energy assessor inspected an office block four and a half years ago. The list sends the building's managing agent an email with the due date and two dates. The agent has changed, so there is no reply. The second message goes to the landlord's contact, who forwards it to the new agent, and she books. A form collects the asset list and the name of the caretaker who holds the roof key. After the visit the report goes out, two recommendations become open lines, and the next date is set for five years on.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often is a TM44 inspection needed?
GOV.UK's guide says air conditioning systems with an effective rated output of more than 12kW must be inspected by an energy assessor, no more than five years apart. The workflow counts from the last inspection date on file.
Does this apply across the UK?
GOV.UK's guide covers England and Wales. Scotland and Northern Ireland have their own rules, so check the guidance for the building's location. The workflow uses the interval you set for each building.
Does the workflow decide whether a building needs an inspection?
No. You or the assessor decide that from the equipment on site. The workflow keeps the dates, reminds people and files the report.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- Payroll Year End Checklist for UK Bookkeepers (2026-27)A UK payroll year end checklist: final FPS, P60 by 31 May, P11D and P11D(b) by 6 July, Class 1A by 22 July, and what to ask payroll clients for, when.
More guides
- F-gas leak check remindersF-gas leak check reminders for air conditioning and refrigeration firms: every system on one list, the next check booked and the record sent on.
- LEV testing remindersFor LEV testing companies and workshops: every extraction system booked before its thorough examination is due, reports sent and actions followed up.
- Forklift operator evaluation remindersFor warehouses, contractors and safety trainers: every forklift operator's three-year evaluation booked before the date, with the record on file.
- Permit and inspection trackingPermit and inspection tracking for contractors: one list of every permit, the next inspection on each job, reminders to book it and results logged.
- All workflow guides