GuideUK
Lightning protection testing reminders: every building booked before its date
A lightning protection testing reminder workflow keeps one row per building with the date of its last test and the next one. Weeks before the date it emails the building's contact with visit dates and asks about roof access, books the reply into the engineers' diary and reminds the site the day before. After the visit it sends the certificate, sets the next date and keeps any remedial quote on a follow-up list.
On this page
Testing firms commonly describe a test and inspection of a lightning protection system about once a year under BS EN 62305, and some book visits at eleven or thirteen months so the earth readings are taken in different seasons. For a lightning protection firm that means every building comes round again, on a date that moves a little each time. The test is the skilled part. The part that slips is remembering which building is due, reaching whoever looks after it now, arranging roof access, and going back to the quote for the corroded bond that was sent with last year's report.
It is one piece of workflow automation for small business: repeat admin that runs itself and leaves you the decisions.
Where repeat tests get lost
- Due dates sit in last year's certificates, and nobody opens them until a customer asks
- The building changed managing agent and the reminder goes to someone who has left
- The engineer arrives and there is no roof access, no permit and no key to the plant room
- A customer with a dozen buildings has a dozen dates, and they are booked one phone call at a time
- The report recommended remedial work, a quote went out, and nobody chased it
- Roof works or new plant changed the system, and the firm hears about it at the next visit
What the list holds for each building
One row per building, not per customer, because buildings fall due on different dates. The interval on each row is set by your engineer. If you move a visit to eleven or thirteen months, the row holds that choice so the next date is counted correctly.
| On the row | Why it is there |
|---|---|
| Building address and access notes | Roof access, permits and keys are arranged before the visit, not on the day |
| Site contact and a second contact | So a reminder still lands when the managing agent changes |
| Last test date and engineer | The next date is counted from it |
| Interval set by your engineer | So a building tested at eleven months is not booked a month late next time |
| Open remedial quote | So the quote is followed up before the next test, not at it |
How the workflow runs
- Every building you test goes on one list with its last test date, the interval and its contacts. The next date is calculated on the row.
- Eight weeks before the date, the site contact gets an email in plain words: the lightning protection test is due, here are three dates, and has anything changed on the roof since last time?
- The same email asks the access questions: who holds the roof key, is a permit needed, and is there an induction.
- The reply books the visit into the engineers' diary. Roof works or new plant are flagged so the office can check the time allowed.
- No reply brings a reminder after a week and another a week later, to the second contact too. After that, the building goes on a call list for the office.
- The day before the visit, the site gets a reminder with the engineer's name and the arrival time.
- Your engineer tests and inspects the system and writes the report. The workflow never judges a reading.
- The office marks the visit done. The certificate and report go to the site contact and the next date is set on the row.
- If the report led to a remedial quote, the contact is asked about it at two and four weeks, and the answer is recorded on the row.
- Once a month, the owner gets the list: buildings due in the next quarter, buildings not yet booked and quotes still open.
- If AI drafts a message to a customer, a person checks it before it is sent.
What stays with your engineer
The test, the readings, the report, the interval and any advice about whether a system is fit for use. The workflow books the visit and keeps asking about the quote. This page doesn't tell a building owner what a standard or an insurer requires of them: your engineer and their insurer do that. For other test rounds on the same buildings, see dry riser testing reminders and emergency lighting test reminders.
How Mike Automations would build this
A free 15-minute call about how many buildings you test and where the due dates live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet, email, a calendar and your report folders). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job management software already books repeat tests and follows up quotes, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: a firm with four engineers tests the systems on 320 buildings. In March the list shows 26 buildings due in May. Each contact gets the email with three dates and the access questions. Seventeen book within a week, and two of them say a permit is needed, so the office requests it. Six book after a reminder. One email bounces, and the second contact, the new managing agent, replies instead. Two buildings go on the call list. After the visits, five reports lead to a remedial quote. Three are accepted at the two-week question, one at four weeks, and one stays on the owner's monthly list.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often is a lightning protection system tested?
Testing firms commonly describe a test and inspection about once a year under BS EN 62305, and some book at eleven or thirteen months so readings are taken in different seasons. Your engineer sets the interval for each building.
Does the workflow do any of the testing?
No. Your engineer tests, inspects and writes the report. The workflow keeps the dates, books the visit, asks about access, sends the certificate and follows up the quote.
Can it handle a customer with many buildings?
Yes. Each building has its own row and date. A customer with several buildings due in the same month can get one email listing them all.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
- Bureau Veritas: Lightning protection systems testing and inspectionbureauveritas.co.uk
- BSI: BS EN 62305-3, Protection against lightning. Physical damage to structures and life hazardknowledge.bsigroup.com
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- How to Reply to New Enquiries Fast: Auto-Reply TemplatesHow to reply to new enquiries fast when you're busy: one list for every enquiry, an honest auto-reply in minutes and a next-day check. Templates included.
More guides
- Dry riser testing remindersFor fire protection firms and block managers: every riser's six-monthly check and annual pressure test on one list, with the visit booked in time.
- Emergency lighting test remindersEmergency lighting test reminders for electrical and fire safety firms: every site's annual test booked on time, and monthly test logs asked for.
- Fall arrest system testing remindersFor UK fall protection companies: every building's next test date on one list, visits and roof access arranged ahead, and remedial quotes followed up.
- Fire damper testing remindersFor fire damper testing firms: every building on one list with its next test date, visits offered weeks ahead and failed or unreached dampers followed up.
- All workflow guides