GuideUK
LEV testing reminders: every system examined before its date
An LEV testing reminder workflow keeps one row per extraction system with the date of its last thorough examination and test. It offers the customer a visit a few weeks before the next one is due, sends the report afterwards, and keeps each action on the report open until someone marks it done. A competent person does the examination and decides whether a system passes.
On this page
Local exhaust ventilation (LEV) takes dust, fume and vapour away from the people working next to it. HSE says an LEV system should have a thorough examination and test at least once every 14 months, and more often for some processes, and that the record is kept for at least 5 years. Fourteen months is an awkward interval: it doesn't fall on the same month each year, so a note in the diary drifts. A testing company with a few hundred systems across its customers, or a workshop with several booths and arms, needs a list that counts for it.
Where LEV tests slip
- The due date is on last year's report, in a folder nobody opens
- One site has six systems tested on different days, so they fall due in different months
- The customer's contact has left and the reminder goes to an old email address
- A system that needs a shorter interval is treated like the rest
- The report lists repairs, and nobody asks whether they were done
- A new booth or arm is installed and never added to the list
What the list keeps
One row per system, not per customer. If you already keep a spreadsheet or use job software, the workflow reads from it and adds the reminders and the follow-up.
| Field | Why it matters |
|---|---|
| Site, system and where it is | So the engineer finds the right hood, booth or arm |
| Interval for this system | 14 months for most, shorter where the process needs it |
| Last and next examination date | So the visit is offered before the date, not after |
| Site contact and a second contact | So a reminder still lands when someone leaves |
| Booking status | Offered, booked, done |
| Report and open actions | Each repair or adjustment has an owner until it is closed |
How the workflow runs
- Each system goes on the list with its interval and the date of its last examination.
- A few weeks before the next one is due, the customer gets an email with the systems due on that site and two dates an engineer is nearby.
- A reply books the visit and puts it in the diary. No reply gets a second message and then goes on a short call list.
- The day before, the site contact gets a reminder with what the engineer needs: access, the process running, and last year's report.
- After the visit, the report is sent to the customer and filed against the system, and the next date is set from the interval.
- Each action on the report becomes a line with an owner. The customer is asked about it until it is marked done, and you can offer a quote for the repair.
- If AI reads a report or drafts a message, a person checks it before it is sent.
What stays with you
The examination and test, the judgement on whether a system controls the hazard, the interval for each system, and the advice you give. The workflow reminds, books and files. It is not health and safety advice: the duty to maintain and test LEV sits with the employer under COSHH, and HSE's guidance is the place to check what applies to a process. Companies that also service air conditioning can use F-gas leak check reminders, and for lifting equipment see LOLER examination reminders.
How Mike Automations would build this
A free 15-minute call about how many systems you look after and where the dates live today. Within 48 hours you get a written plan with a fixed price and a clear definition of "working". It's built on what you already use (a spreadsheet or job software, email, a calendar and a shared folder). Live in 2-3 days. Workflow automation is a fixed $2,000, and you pay once it's running and you're happy with it, under the pay-when-happy agreement. If your job software already reminds customers per system and tracks report actions, you don't need this, and we'll say so on the call.
ExampleFor illustration
What it looks like in practice
For illustration: an LEV testing company looks after a joinery workshop with four extraction systems. Five weeks before the spray booth is due, the workshop manager gets an email listing the booth and two dates. She picks the second. The day before, she gets a reminder to have the booth running. The report notes a damaged duct on one arm. That becomes an open action, the workshop is asked about it two weeks later, and it is closed when the repair is confirmed. The next date goes on the list.
What it costs
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month. You get the exact scope and price in a written plan after a free 15-minute call.
Book a free 15-minute callBuild your plan for thisEmail me
No pitch. In 15 minutes you'll know if it's worth building.
One person, Michael, a software engineer, builds it. Fixed price in writing, and you pay only once it's live and you're happy with it.
Common questions
How often does LEV need testing?
HSE says a thorough examination and test at least once every 14 months, and more often for some processes. The workflow counts from the last examination using the interval you set for each system.
How long is the LEV test record kept?
HSE says the record is kept for at least 5 years. The workflow files each report against its system so it can be found.
Does the workflow decide whether a system passes?
No. A competent person examines and tests the system and writes the report. The workflow only reminds, books and files.
How much does it cost?
Workflow automation is a fixed $2,000, paid once it's running and you're happy with it. The first 3 businesses pay $1,500. Optional support is $150 a month.
Sources
The facts on this page were checked against these official sources, last on .
- HSE: LEV frequently asked questionshse.gov.uk
- COSHH Regulations 2002, regulation 9legislation.gov.uk
Read next
- Spreadsheet vs CRM for a Small Service BusinessSpreadsheet vs CRM for a small service business: the signs you've outgrown the sheet, what a switch costs, a decision table and a 7-step move.
- What to Automate First in a Small Business: A 5-Point TestWhat to automate first in a small business: score each job on 5 questions and pick the one that repeats weekly and hurts most when forgotten.
- How to Automate Data Entry from Emails and PDFsHow to automate data entry from emails and PDFs: parsing, OCR and AI extraction compared, a review checklist, and the human check that stops bad data.
More guides
- F-gas leak check remindersF-gas leak check reminders for air conditioning and refrigeration firms: every system on one list, the next check booked and the record sent on.
- LOLER examination remindersLOLER thorough examination reminders for inspection firms: one register per site, customers asked before each due date, reports sent and defects followed up.
- PSSR examination remindersFor compressor service companies and pressure system engineers: every customer's written scheme examination booked before its date, report filed.
- Asbestos re-inspection remindersAsbestos re-inspection reminders for UK surveying companies: every client's next re-inspection on one list, visits booked and reports sent.
- All workflow guides